  1. Construction of two new water-tanks at a higher point of the community so that the water-supply will be administered in a wider range.
  2. Replacement of the entire water-supply system.
  3. Regional expansion of the water-supply system by 12 kilometres towards Mandria, Phini, and Platres.
  4. Asphalt paving, widening, and improvement of the streets. Registration of new rural roads.
  5. Various beautification projects.
  6. Creation of a large community park with a playground, verdant areas, and a plaza.
  7. New community buildings where the community's services are housed.
  8. Beautification of the two old fountains at the community's centre.
  9. Modulation of the botanical garden with sidewalks and trails.
  10. Construction of flood-prevention projects.
 